Engineering workspace

One place for
serious tools

Syncster hosts focused apps for engineers. No feed, no noise—just worksheets, projects, and data you can rely on—from open-channel hydraulics in FlowStudio to geotagged field photos in Raven, and desktop apps written in Tessel, our own programming language.

Apps

Subdomains under syncster.dev

  • raven.syncster.dev Live

    Raven

    Turn geotagged JPEG, PNG, TIFF, or HEIC photos into a self-contained KMZ for Google Earth—with map pins, labels, field notes, and embedded thumbnails.

    • Reads GPS from images; flags photos without location data
    • Export includes scaled images for offline viewing in Google Earth
    • Save work as .raven project files with per-image notes
    Open Raven
  • pdfly.syncster.dev Live

    pdfly

    A browser-based PDF toolkit—compress, combine, convert images to PDF, organize pages, edit content, and password-protect or unlock files—processed server-side and cleaned up right after.

    • Compress, merge, and convert images to PDF
    • Reorder, rotate, delete pages; add text, ink, and highlights
    • Encrypt, decrypt, and remove restrictions
    Open pdfly
  • timelapse.syncster.dev Live

    Timelapse

    Turn an ordinary video into a smooth, sped-up timelapse—upload a clip, choose a speed from 2× to 120×, and download the result. No signup, no watermark, and your upload is automatically deleted 24 hours after processing.

    • Speed any video up from 2× to 120×
    • Re-rendered at a smooth 30 fps as a standard MP4
    • Uploads auto-deleted 24 hours after upload
    Open Timelapse
  • vidu.syncster.dev Live

    vidu

    A browser-based YouTube downloader—paste a link, pick a quality, and save it as video (MP4) or audio (MP3). Files are fetched server-side and cleaned up right after. For educational use.

    • Choose MP4 video quality or MP3 audio-only
    • Server-side fetch and mux; temporary files removed after download
    • For content you own or have permission to use
    Open vidu
  • kanta.syncster.dev Live

    kanta

    A song search engine—type an artist or title and get a list of downloadable MP3 files, each with an inline player. Searches the Internet Archive's legal catalog by default. For educational use.

    • Inline audio preview plus direct download links
    • Keyless by default via the Internet Archive (public-domain, CC, live sets)
    • For content you own or have permission to use
    Open kanta
  • pyopenchannel.syncster.dev Python

    PyOpenChannel

    An open-source Python library for open channel flow: normal and critical depth, water surface profiles, weirs, gates and hydraulic jumps, tested against the textbook equations.

    • pip install pyopenchannel, MIT licensed
    • Dam and bridge backwater, M/S/C/H/A profile types
    • Rehbock, ogee and Villemonte weirs; free and submerged sluice gates
    Read the docs
  • blog.syncster.dev Live

    Blog

    The Syncster blog: practical walkthroughs for Google Sheets, Apps Script, and JavaScript automation (reports, email, triggers)—alongside longer reads on AI, LLMs, generative tools, and tech history.

    Visit the blog

More apps will appear here as they ship.

Desktop apps

Native apps for the Mac, written in Tessel

  • tally.syncster.dev macOS

    Tally

    A desktop spreadsheet that opens your Excel and OpenDocument workbooks, calculates what Excel calculates, and starts in a blink.

    • Over 490 functions, dynamic arrays, LET and LAMBDA
    • Charts, tables, pivot tables, and printing with a live preview
    • Reads and writes .xlsx and .ods, passwords included
    Download Tally
  • quill.syncster.dev macOS

    Quill

    A word processor that shows your document as pages, the way it will print, and opens the Word files people send you.

    • Styles, tables, footnotes, headers and footers, a table of contents
    • Comments and tracked changes that travel with the document
    • Reads and writes .docx, .odt and .rtf; exports PDF
    Download Quill
  • slope.syncster.dev macOS

    Slope

    The stability of slopes, two independent ways: finite elements with strength reduction, which find the failure on their own, and the slip circles engineers have trusted for a century.

    • Bishop, Spencer and the ordinary method beside the finite elements
    • Water tables, steady seepage and rapid drawdown
    • Loads, earthquakes, nails, anchors and geogrids
    Download Slope
  • flume.syncster.dev macOS

    Flume

    Open channel flow, worked out as you type: normal and critical depth, the hydraulic jump and water surface profiles, with the channel drawn as it goes and the calculation written up as a PDF report.

    • Rectangular, trapezoidal, circular, parabolic and surveyed sections
    • Gradually varied flow by the direct step method, every profile type
    • Weirs and sluice gates as controls, and where the jump lands between them
    Download Flume
  • mathpad.syncster.dev macOS

    MathPad

    A math notebook that shows its working: type a problem as you would write it on paper, and get the answer with every step that leads to it.

    • Numbers with units, or algebra and calculus in symbols
    • Equations, systems, matrices and numerical solvers
    • Plots, tables and sliders on real pages; exports PDF
    Download MathPad
  • forebay.syncster.dev macOS

    Forebay

    Reservoir operation studies: play a river's record through a reservoir and see how well it serves the town, the farms and the power plant, month by month.

    • Water supply, environmental flow, irrigation from crops, hydropower
    • Rule curves, firm yield, and a search for better curves
    • Synthetic inflows and flood routing over the spillway
    Download Forebay
  • keystone.syncster.dev macOS · Windows

    Keystone

    Project scheduling with Microsoft Project's scope: a Gantt chart you can drag, the critical path, resources and costs, baselines and progress.

    • Type the plan as an outline; drag bars to move and link tasks
    • What-if scenarios, leveling, earned value and the S-curve
    • Reads and writes MS Project XML, Primavera P6 XER and Excel
    Download Keystone
  • reel.syncster.dev macOS · Windows

    Reel

    A media player for nearly every format, with every container and codec written from scratch: H.264, HEVC, AV1, VP9, DTS-HD, TrueHD and more.

    • A library of films, shows and music that picks up where you left off
    • Find any line of dialogue; seek previews and a scene strip
    • Equalizer, picture settings and lossless clip export; open source
    Download Reel
  • leaf.syncster.dev macOS · Windows

    Leaf

    A PDF reader and editor with its own PDF engine: comment, change text and pictures in place, fill and sign forms, and organize pages.

    • Edit text in place, reflowed with the document's own fonts
    • Passwords, true redaction, OCR for scans and side-by-side compare
    • Batch tools, a command palette, tabs and dark mode
    Download Leaf
  • draftwork.syncster.dev macOS · Windows

    Draftwork

    A free 2D CAD app with an AutoCAD-style command line, for drafting plans, sections and details in DWG and DXF.

    • Opens and saves DWG (2000 to 2018) and DXF (R12 to 2018)
    • Object snaps, associative dimensions, hatches, blocks and arrays
    • Layouts with viewports, tables, SHX fonts and PDF plotting
    Download Draftwork
  • terrace.syncster.dev macOS · Windows

    Terrace

    Civil engineering design for the whole job, from survey points to plan-and-profile sheets, with DPWH and AASHTO built in.

    • Surfaces, alignments, profiles, corridors and earthwork
    • Grading, storm drains, water mains and parcels
    • LandXML, DWG/DXF and PDF; Terrace Pro adds hydraulics and DPWH quantities
    Download Terrace
  • forma.syncster.dev macOS · Windows · Linux

    Forma

    Building information modeling with Revit's scope: one model, and the plans, sections, schedules and sheets stay in step with it.

    • Architecture, structure with an analysis solver, and MEP systems
    • Families and a family editor, phases, design options, worksharing
    • IFC in and out, DWG/DXF, PDF and rendered images
    Download Forma
  • swarm.syncster.dev macOS · Windows

    Swarm

    A fast BitTorrent client that downloads many parts of a file at once and shows each of them on the progress bar.

    • Magnets, DHT, uTP, encryption and a live pieces map
    • Create torrents, RSS, a scheduler, categories and tags
    • Search free and legal sources, stream while downloading, web remote
    Download Swarm
  • subtle.syncster.dev macOS · Windows · Linux

    Subtle

    An SRT subtitle editor with the video beside the cues, to time every line to the frame and fix a whole file's timing in one step.

    • Video preview with the subtitles drawn over it
    • Shift, two-point sync, speed % and frame-rate conversion
    • Split, merge, spell check, and subtitles from speech with Whisper
    Download Subtle